SaskPower 110kV Double-Circuit Transmission Line Critical Tower Repairs
Creighton, Saskatchewan
SaskPower 110kV Double-Circuit Transmission Line Critical Tower Repairs
3 Year Winter Project (2017, 2018, 2019)
read moreCreighton, Saskatchewan
SaskPower 110kV Double-Circuit Transmission Line Critical Tower Repairs
3 Year Winter Project (2017, 2018, 2019)
read moreBritish Columbia, Canada 2018
Ampjack completed a corrosion risk mitigation project for BC Hydro in the lower mainland of British Columbia, Canada during October and November 2018.
read moreCreighton, Saskatchewan
In the Winter of 2017, Ampjack rescued 15 critcally damaged and leaning towers on a remote northern 115kV double circuit transmission line using a modified AMPJACK® tower lift system.
read moreSouth Central California, USA May 2017
AMPJACK® offered an extremely light footprint, which allowed fast tracking of the environmental permitting required for this transmission line upgrade project.
read moreSouth Central California, USA
Two Single Circuit 500 kV towers were raised 10ft & 15ft and were completed in a total of 10 days.
read moreSkokie, Illinois, USA
This raise project had many interesting challenges. The structure is located along one of the busiest commuter train ROW’s in the Nation.
read moreRichmond, Texas, USA
Richmond Texas, December 2016
Ampjack Industries Ltd. completed it’s first double circuit 138 kV raise project December 19, 2016.
read moreSaskatchewan, Canada
Ampjack is performing energized services for SaskPower.
read moreIllinois, USA
Ampjack successfully completed the first energized mid-tower lift on a 345kV nuclear-powered transmission line – the first in the country.
read moreSioux City Iowa, Bismarck North Dakota and various locations in South Dakota
Ampjack Industries Ltd. completed 40 tower raises on 230 kV double circuit transmission lines for Western Area Power Authority Upper Great Plains region during the Fall and Winter of 2015/16.
read moreIllinois, USA
Performance Acceptance testing of AMPJACK® Tower Raise System on Un-balanced Dead-End Structure.
read more
Saskatchewan, Canada
This was Ampjack’s first raise project in Canada. Phase 1 was completed in 2015, 26 lattice structures of two tower types were lifted in 5’-0" or 2'-6" increments to total 7'-6", 10’-0", 12'-6" and 15’-0" raises.
read moreNew York, USA
The New York Utility Owners required more ground clearance to maintain safe operation on their lines.
read moreSaskatchewan, Canada
Ampjack was asked to investigate towers in water and ice which were suspected to have damage caused by shifting ice flows.
read more