NERC Compliance Can Be Challenging

New York, USA

The New York Utility Owners required more ground clearance to maintain safe operation on their lines. The AMPJACK® Tower Raising Solution is more manageable and cost effective than using cranes.

The project scope included raising 13 structures, with lifts ranging from 7'-6" to 15'-0". With this added clearance the utility becomes NERC compliant within those spans.